driven pile
基本解释
- [建] 打入桩
英汉例句
- The driveability analysis is a key in the optimized design method for driven pile.
基桩可打性分析是打入桩优化设计方法的关键环节。 - Time is adopted to analyze excess pore water pressure due to driven pile in clay; and a formula is derived.
引入时间参数分析在粘土中沉桩时所引起的超静孔隙水压力,给出了考虑固结效应的超静孔隙水压力的解。 - Model tests of large driven pile jacked into sands were conducted to obtain the soil density changes due to the compaction.
通过砂土中的大型沉桩模型试验,得出了桩周土体相对密度的变化规律。 - Once the caisson was in position, the pile would be pumped out and driven into the ooze.
ECONOMIST: Fixing oil wells - Pile: long heavy section of timber, concrete or metal, driven into the earth or seabed as support for another structure.
UNESCO: L O S S A R Y
双语例句
权威例句
词组短语
- driven caisson pile 沉管灌注桩
- Driven n pile 打击桩
- driven precast pile 锤击预制桩
- pipe driven filling pile 锤击沉管灌注桩
- statically -driven anchor pile 锚杆静压桩
短语
专业释义
- 锤击桩
Finally, on the basis of previous work, the paper sets up the neural network model on the prediction of ultimate bearing capacity of driven pile.
最后在此基础上建立了锤击桩单桩极限承载力预测的神经网络模型。 - 打入桩
- 打击桩
- 入土桩
- 打入桩