wild cat well
常见例句
- The prediction model was adapted to predict borehole stability of pre-drilling formation by using the log data of drilled part for the first wild cat well.
該方法主要解決以第一口探井二開有測井數據爲前提,預測二開下部待鑽地層的井壁穩定性。
syxb-cps.com.cn 返回 wild cat well